How To Fix a Cement Paver to a Concrete Surface

How do you fix a cement paver to a concrete surface without sand and cement?

Where this method suits and where it does not

Adhesive-fixing pavers is at its best for a single layer of pavers onto a sound, existing concrete slab: a landing, a step tread, a threshold, a strip of pavers on a path, or a replacement for one that has cracked. It avoids building up the level the way a sand and cement bed does, which matters at a doorway.

It is not a substitute for a bed where the surface is uneven. Adhesive is not a levelling compound — the paver ends up wherever the slab puts it. If your slab has falls or humps you need to correct, that is a bedding job, not an adhesive job.

The same product also handles the neighbouring tasks on its data sheet: stabilising stone and interlocking masonry retaining walls, bonding capstones to walls, repairing rockeries, sealing between treated pine logs to reduce soil loss, and stabilising loose stone steps.

Limitations

  • Not for soft or crumbly materials. A flaking or friable slab surface must be cut back to sound concrete first.
  • Do not use as the sole bonding agent for structural bonding. Pavers on a slab are fine; a retaining structure is not.
  • If repositioning materials, fresh adhesive must be applied to achieve bonding. You cannot lift and relay a paver on the same dobs.
  • Not for permanent water immersion.
  • Do not allow traffic for at least 24 hours, and longer on thick beds.
  • Do not wipe squeeze-out — trimming cured adhesive is cleaner than smearing wet adhesive across a porous paver face.

How to lay them

  1. Ensure the slab is sound, dry and free from oil, grease and loose powdery material. If necessary, use mineral turpentine to clean the surface and allow it to dry. A slab with a laitance or curing-compound film needs that removed first — the adhesive can only be as strong as the surface it grips.
  2. Check the paver backs too. Fresh precast pavers often carry release agent. Wash or abrade and dry them.
  3. Dry-lay the pavers first and mark your setting-out. Once the adhesive is on, adjustments are not available.
  4. Cut the cartridge tip, fit the nozzle and cut the nozzle to a suitable size opening — approximately 5 mm. Apply with a caulking gun.
  5. Apply dobs or beads of adhesive of appropriate thickness to ensure sufficient contact and spread between both surfaces. To minimise squeeze-out, apply at least 12 mm in from the edges.
  6. Immediately bring the surfaces together before the product skins — within 5 minutes — and apply sufficient pressure to spread the adhesive between both surfaces. Press or tap the paver down to seat it.
  7. Do not wipe excess squeeze-out. Wait until the product cures and remove it by trimming with a sharp blade, avoiding cutting into the bond.
  8. Leave undisturbed until the adhesive cures sufficiently. Do not allow traffic on stairs or use walls for at least 24 hours.

Clean up and storage

Uncured product may be removed with mineral turpentine. Cured product can be removed with Selleys Sealant Remover or by mechanical action. Spilt or smeared adhesive is best left to cure and then removed by abrasion. Store the cartridge in a cool, dry, well-ventilated place out of direct sunlight, and away from foodstuffs.

The figures

Indicative data only, not intended for the preparation of specifications.

What the numbers mean when laying pavers

Skin time of 10 to 15 minutes gives you a strict five-minute working rule. Our directions say to bring the surfaces together before the product skins, and to treat five minutes as the limit. In practice that means gluing and placing one paver at a time, not buttering a row and then laying them. On a hot, windy day the skin forms faster still.

The cure rate of 2 mm per 24 hours sets your timetable, and it is slower than people expect. Dobs of adhesive thick enough to bed a paver onto a slightly uneven slab are several millimetres deep, and the adhesive cures from the outside in. The published minimum is to allow no traffic for at least 24 hours; on thicker beds allow longer. Walking on a paver that has skinned but not cured breaks the bond invisibly, and it lifts a month later.

Shore A hardness of about 30 with elongation over 300% is why this works better than a rigid adhesive. A concrete slab and a cement paver both expand in the sun, but not by the same amount and not at the same time. A rubbery, high-elongation bond absorbs that differential; a hard, brittle one transfers it to the paver and cracks the bond line.

Use the document for your exact cartridge

The current product page lists a 415 g beige, solvent-based adhesive, while the November 2020 Technical Data Sheet describes a 300 g grey neutral-cure silicone. Those documents do not describe the same specification. Do not transfer the older sheet’s colour, chemistry, pack, working-time, cure or cleanup figures to a current cartridge; follow the label and matching technical data for the pack you have.

It is a premium grade, high strength construction adhesive that delivers a weather resistant, high strength, flexible and shock proof bond — which is the right combination for something laid outdoors, walked on, and heated and cooled every day.

Apply this expert answer to the actual job

The answer addresses a particular problem. Before following it, compare the question’s materials, age and condition of the work, exposure, dimensions and desired finish with your own. A change in substrate, coating, product formulation or service condition can change the correct method.

  1. Identify the exact product and pack involved.
  2. Test the least aggressive or least invasive step in a small area where appropriate.
  3. Observe the stated working, waiting and cure periods.
  4. Stop if the surface softens, discolours, loses adhesion or behaves differently from the example.
  5. Use the current label, Technical Data Sheet and Australian Safety Data Sheet for product-specific decisions.

When the answer is not enough

Seek product or trade advice when the repair carries load, controls water, affects glazing, involves electricity or gas, contacts food or drinking water, or sits outside the published limitations. Include photographs, dimensions, both materials, exposure and pack details when asking for further help.

Complete bond-planning checklist for How To Fix a Cement Paver to a Concrete Surface

Write down both substrates, including paint, coatings, laminates, backing films and whether each surface is porous. Define the joint gap, load direction, vibration, movement, water, weather, heat and required finish. These details decide whether the named product is suitable and whether temporary support or permanent mechanical fixing is required.

  1. Confirm both materials and every surface treatment are listed or otherwise covered by the current instructions.
  2. Separate working time, repositioning time, initial grab, support-removal time and full cure.
  3. Dry-fit the parts and prepare clamps, braces or fixings before opening the product.
  4. Follow the stated bead, spread, contact or assembly method.
  5. Keep the joint unloaded and within the specified conditions until the relevant cure milestone.

Do not transfer a strength, grab or cure claim from another formulation in the same range. Mirrors, flexible plastics, polystyrene, continuously wet areas, overhead work and structural loads require explicit product coverage.

Details to check before you choose

More help for your project

Use these pages to compare the exact product, method or application that follows from How To Fix a Cement Paver to a Concrete Surface. A related page is a route into more specific information, not evidence that every product is interchangeable.

What adhesive is recommended?

Liquid Nails Landscape, after confirming the exact pack and matching technical instructions because the current product page and linked historical TDS describe different formulations.

Can I use the older five-minute assembly and 2 mm/day figures?

Do not transfer those figures to a different current pack. Ask Selleys for the matching technical sheet and follow its method and support requirements.

Does the paver recommendation also approve pool immersion?

No. Confirm poolside fibreglass and water exposure separately. The November 2020 TDS excludes permanent immersion and sole-agent structural bonding.

Where this method suits and where it does not?

Adhesive-fixing pavers is at its best for a single layer of pavers onto a sound, existing concrete slab: a landing, a step tread, a threshold, a strip of pavers on a path, or a replacement for one that has cracked. It avoids building up the level the way a sand and cement bed does, which matters at a doorway.

What are the limitations?

Not for soft or crumbly materials. A flaking or friable slab surface must be cut back to sound concrete first; Do not use as the sole bonding agent for structural bonding. Pavers on a slab are fine; a retaining structure is not; If repositioning materials, fresh adhesive must be applied to achieve bonding. You cannot lift and relay a paver on the same dobs; Not for permanent water immersion; Do not allow traffic for at least 24 hours , and longer on thick beds; Do not wipe squeeze-out — trimming cured adhesive is cleaner than smearing wet adhesive across a porous paver face.

How do I lay them?

Ensure the slab is sound, dry and free from oil, grease and loose powdery material. If necessary, use mineral turpentine to clean the surface and allow it to dry. A slab with a laitance or curing-compound film needs that removed first — the adhesive can only be as strong as the surface it grips; Check the paver backs too. Fresh precast pavers often carry release agent. Wash or abrade and dry them; Dry-lay the pavers first and mark your setting-out. Once the adhesive is on, adjustments are not available.

How do I clean up and store it?

Uncured product may be removed with mineral turpentine. Cured product can be removed with Selleys Sealant Remover or by mechanical action. Spilt or smeared adhesive is best left to cure and then removed by abrasion. Store the cartridge in a cool, dry, well-ventilated place out of direct sunlight, and away from foodstuffs.

What the numbers mean when laying pavers?

Skin time of 10 to 15 minutes gives you a strict five-minute working rule. Our directions say to bring the surfaces together before the product skins , and to treat five minutes as the limit. In practice that means gluing and placing one paver at a time, not buttering a row and then laying them.