How To Install a Vertical Garden

How do you install a vertical garden without drilling into the wall?

A vertical garden unit can be mounted with adhesive rather than fixings, which is why this job appeals to renters and to anyone who would rather not drill into brickwork or tile. The method is short: mark out the position, clean the wall, apply Selleys Hold Up to the back of the unit in vertical stripes about 5 cm apart, press it firmly to the wall, level it, and leave it for at least 48 hours before hanging anything on it.

That 48 hour wait is the whole job. Hold Up feels solid long before it is strong, and a vertical garden is a load that grows — a trough of dry potting mix weighs a fraction of the same trough watered. Loading the unit early is the one mistake that brings the whole thing off the wall.

Why Hold Up works for this, and what its numbers mean

Hold Up is designed for mounting, bonding and sticking tasks without screws, nails or clamps, including on vertical surfaces. It is heat, UV and water resistant, and it is rated for indoor and outdoor use. It works on most materials: timber, concrete, MDF, particleboard, plasterboard, metals, some plastics, glass, masonry, tiles and ceramics.

AppearanceSmooth white paste
TechnologySil-X
Cure timeAt least 48 hours
Skin timeApprox. 45 minutes
AdjustableUp to 15 minutes
PaintableAfter 48 hours with water-based paints
Vertical loadUp to 240 kg/m² (tube) or 360 kg/m² (cartridge)
Packaging130 g tube (white/off-white), 290 mL cartridge (white)
Shelf life12 months

Indicative data only, not intended for preparation of specifications.

Fifteen minutes of adjustability is what makes this job forgiving. You can press the unit up, check it with the spirit level, slide it true and press again. Use that window — a vertical garden that is 5 mm out at one end is obvious once it is planted.

A 45 minute skin time against a 48 hour cure is the gap people misjudge. Within the hour the adhesive looks and feels set. It is not. The data sheet states plainly that the bond must not be disturbed until cured, at least 48 hours, and that longer cure times are needed in cold or dry conditions or where both surfaces are non-porous — which a rendered wall and a plastic garden unit both are.

The load figures — 240 kg/m² from the tube and 360 kg/m² from the cartridge on vertical surfaces — are per square metre of bonded area, not per bead. Applying vertical stripes 5 cm apart across the full back of the unit is what gets you a usable area; three dabs in the middle does not. For heavy objects, overhead applications and non-porous materials such as glass and metals, the data sheet recommends using additional supports such as clamps during cure as a precaution.

Limitations — where Hold Up should not be used

How to install it

  1. Measure and mark. Using your tape measure and pencil, mark out where you want the vertical garden unit to go on the wall.
  2. Clean the surfaces. Make sure they are clean and free from grease, grit and grime. Sand back any loose or peeling surface — on a painted wall, check the paint is sound and not flaky or peeling, because the bond is only ever as strong as the layer it is stuck to.
  3. Apply the adhesive. Put Hold Up onto the back of the unit in vertical stripes approximately 5 cm apart, covering the full surface. If you are using the cartridge, face the V cut-out of the nozzle upwards and use a good-quality caulking gun.
  4. Press it into place. Firmly press the unit against the wall in the marked-out space, making sure the adhesive spreads.
  5. Level it. Check with a spirit level and adjust if needed — Hold Up is adjustable for up to 15 minutes.
  6. Clean up immediately. Remove any excess adhesive with white spirits before the product cures. Once it has cured, it will not come off cleanly.
  7. Wait at least 48 hours before hanging the hooks into the frame. Allow longer in cold or dry conditions, or where both surfaces are non-porous.
  8. Plant it. Attach the troughs to the hooks, fill with potting mix, pot your plants and water.

Clean up and storage

Clean up immediately with white spirits or turps before the product cures. Store Hold Up in a cool dry place below 30°C. Unopened shelf life is 12 months.

What you need

Plan the complete project before starting How To Install a Vertical Garden

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

  1. Inspect the substrate and correct moisture, movement, contamination or loose material first.
  2. Dry-fit parts and test appearance or compatibility in an inconspicuous area where appropriate.
  3. Confirm weather, temperature, ventilation and access for the full work and cure period.
  4. Keep within the stated working time, dimensions, coverage and waiting periods.
  5. Check the finished work before loading, wetting, painting or returning it to service.

Adapt the method without changing the product limits

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

Before you start: How To Install a Vertical Garden

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.

  1. Read the complete method and limitations before opening the pack.
  2. Prepare surfaces, tools, supports and personal protective equipment.
  3. Confirm temperature, ventilation and weather conditions for application and cure.
  4. Keep within the stated dimensions, coverage, working time and waiting periods.
  5. Stop and obtain advice when the intended use is not expressly covered.

Range names and broad category labels are useful for finding options, but only the exact product instructions establish compatibility and use.

Details to check before you choose

More help for your project

Use these pages to compare the exact product, method or application that follows from How To Install a Vertical Garden. A related page is a route into more specific information, not evidence that every product is interchangeable.

Product instructions and safety sheets

Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations.

Need help matching a document or checking your job? Contact our team. You can also find a store.

When can I add the planted troughs?

After full cure, at least 48 hours and longer in cold/dry conditions or non-porous joints, with the complete wet load and fixing arrangement confirmed.

Can I adjust the frame?

Yes, within 15 minutes; check level promptly and then leave supported and undisturbed.

Are tube and cartridge SDSs identical?

No. Use the matching format’s safety sheet, including its specific ventilation controls.

How do you install a vertical garden without drilling into the wall?

A vertical garden unit can be mounted with adhesive rather than fixings, which is why this job appeals to renters and to anyone who would rather not drill into brickwork or tile. The method is short: mark out the position, clean the wall, apply Selleys Hold Up to the back of the unit in vertical stripes about 5 cm apart, press it firmly to the wall, level it, and leave it for at least 48 hours before hanging anything on it.

Why Hold Up works for this, and what its numbers mean?

Hold Up is designed for mounting, bonding and sticking tasks without screws, nails or clamps, including on vertical surfaces. It is heat, UV and water resistant, and it is rated for indoor and outdoor use. It works on most materials: timber, concrete, MDF, particleboard, plasterboard, metals, some plastics, glass, masonry, tiles and ceramics.

What are the limitations?

Not for some plastics — polyethylene, polypropylene and PTFE — or some rubbers. If your garden unit is moulded plastic, check what it is made from before you commit, and test on an offcut if you can; Water resistant, but not suitable for permanent water immersion. A wall that gets rained on is fine; a bond line sitting in standing water is not. Make sure the troughs drain away from the wall rather than onto the bond; Must not be disturbed until cured — at least 48 hours.

How do I install it?

Measure and mark. Using your tape measure and pencil, mark out where you want the vertical garden unit to go on the wall; Clean the surfaces. Make sure they are clean and free from grease, grit and grime. Sand back any loose or peeling surface — on a painted wall, check the paint is sound and not flaky or peeling, because the bond is only ever as strong as the layer it is stuck to.

How do I clean up and store it?

Clean up immediately with white spirits or turps before the product cures. Store Hold Up in a cool dry place below 30°C. Unopened shelf life is 12 months.

What will I need?

Selleys Hold Up — 130 g tube or 290 mL cartridge; Caulking gun (if using the cartridge); Vertical garden unit, troughs and hooks; Tape measure and pencil; White spirits and a cloth; Potting mix and plants.

How do I plan the complete project before starting How To Install a Vertical Garden?

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

How can I adapt the method without exceeding the product's limits?

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

What should I know about before you start?

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.