How To Tile Your Bathroom

How do you tile a bathroom yourself?

Tiling can be a costly exercise. With the Selleys White For Life range and a methodical approach it is a job you can do yourself, at a fraction of the cost, and get a result you will be proud of.

The sequence is: mix the adhesive, spread about a square metre at a time with a notched trowel, bed each tile before the adhesive skins, level them, clean the excess off within 20 minutes, and keep off the floor for at least 24 hours. Grouting and sealing come afterwards, as separate stages with their own waiting periods.

Before you start — planning

Order extra. Add an extra 10% for waste and cuts, or 15% if you are laying diagonally. Diagonal layouts generate far more offcuts, and running out of tile mid-job with a discontinued batch is the worst outcome in the whole project.

Dry lay first. Always dry lay your tiles without adhesive before tiling, to work out your placement. It is the best way to avoid mistakes and to confirm you have the right number of tiles, and which ones need cutting, before anything is permanently glued.

Pre-cut where you can. Pre-cut the tiles where required, and make sure you cut each one smaller than the space to allow for even grout joints. A tile cut to exactly fill the gap leaves no joint, and a joint is not decorative — it is what absorbs movement and dimensional variation between tiles.

What you will need

For small tiling jobs and repairs, Selleys White For Life Ready To Use Tile Adhesive removes the mixing stage — it is a high grab wall and floor tile adhesive supplied ready mixed.

Step 1 — Mix the adhesive

Add water to the bucket, then slowly add the White For Life Powder Tile Adhesive powder while mixing with a paddle, ensuring there are no lumps. The ratio is 600 mL of water to a 2 kg powder bag. A paddle attached to a drill makes mixing easier and faster.

Allow the mixture to stand for 5 minutes before use.

Powder into water, not water into powder — that is what prevents dry lumps forming in the middle of the mix. The five minute stand lets the powder wet out fully, and mixing again after it gives a smoother, more consistent adhesive.

Step 2 — Spread the adhesive

Spread the adhesive evenly onto the surface using a notched trowel, working on about one square metre at a time.

One square metre is not arbitrary — it is roughly the area you can cover and tile before the adhesive begins to skin. Spread more than that and the far edge will have formed a surface skin by the time you reach it, and tiles bedded onto a skinned adhesive do not bond.

Do not use the spot fixing method. Dabs of adhesive under the corners of a tile leave voids behind it. In a wet area those voids fill with water, and the tile is only supported at four points. Full notched coverage is the method.

Step 3 — Bed each tile

Place and fix each tile in position before the adhesive forms a surface skin. Adjust and bed the tile by sliding it roughly perpendicular to the notch pattern, to ensure full coverage on the back of the tile.

That sliding action is the whole technique. The notched ridges have to collapse and spread into a continuous bed. Sliding along the ridges leaves them standing; sliding across them flattens them out.

Some larger or deeply keyed tiles will also need buttering — adhesive applied to the back of the tile as well — to ensure full coverage. Use spacers to keep the grout joints even.

Step 4 — Level the tiles

Check that the tiles are level and use a rubber mallet to tap and level them lightly if required.

If the mortar rises up between the tiles as you place them, the bed is too thick and you need a smaller trowel. Adhesive squeezing into the joints is not a sign of good coverage — it is a sign the notch size is wrong for the tile, and it makes grouting far harder later because the joints have to be raked out.

Step 5 — Clean off the excess

Remove excess adhesive from the face of the tiles and from the joints with a damp cloth or sponge, before the adhesive sets (20 minutes).

Twenty minutes is the entire window. Adhesive left on a tile face past that has to be removed mechanically, and doing that on a glazed tile risks the glaze. Clean each square metre as you finish it rather than at the end of the day.

Step 6 — Leave it alone for 24 hours

Once the tiles have been laid, they must not be disturbed and must not be subjected to foot traffic for at least 24 hours.

This is the step people compress and it costs them tiles. An adhesive bed that has taken a footfall before it has set does not recover — the tile sits fractionally proud or drummy, and it will come loose eventually.

Where to start on a floor

When tiling a floor, it is recommended to start from a central point and work your way out to each corner, one at a time. Starting centrally puts the cut tiles at the perimeter where they read as intentional, and keeps any accumulated error out of the middle of the room where the eye goes.

Plan your exit as part of the layout, so you are not tiling yourself into a corner.

What comes next

Tiling is the first of three stages, each with its own waiting period. Do not compress them:

  1. Tile — then leave 24 hours with no foot traffic.
  2. Grout — mix, work into the joints, let firm up 10–15 minutes, sponge off, buff after 24 hours, then leave a further 3 days before exposing the grout to water in a shower.
  3. Seal the grout — two coats of White For Life Grout Sealer, one hour penetration each, at least 24 hours before water, and re-seal every 12 months.

For ongoing maintenance afterwards, Selleys White For Life Tile & Grout Cleaner removes dirt and stains from tiles and grout.

Plan the complete project before starting How To Tile Your Bathroom

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

  1. Inspect the substrate and correct moisture, movement, contamination or loose material first.
  2. Dry-fit parts and test appearance or compatibility in an inconspicuous area where appropriate.
  3. Confirm weather, temperature, ventilation and access for the full work and cure period.
  4. Keep within the stated working time, dimensions, coverage and waiting periods.
  5. Check the finished work before loading, wetting, painting or returning it to service.

Adapt the method without changing the product limits

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

Complete surface-system plan for How To Tile Your Bathroom

Define the substrate, moisture condition, surface profile, expected traffic or movement and the complete system that will be installed above it. Adhesive, leveller, grout, sealer and cleaner each perform different roles and must be compatible with the substrate and one another.

  1. Check flatness, strength, moisture and contamination before preparation.
  2. Use the required primer or conditioning step.
  3. Mix and apply within the stated working time and thickness.
  4. Maintain movement joints and other designed breaks.
  5. Keep the surface out of service until the relevant cure milestone.

Do not infer system suitability from one component alone. Confirm the full method and substrate limits in the current technical documents.

Details to check before you choose

More help for your project

Use these pages to compare the exact product, method or application that follows from How To Tile Your Bathroom. A related page is a route into more specific information, not evidence that every product is interchangeable.

Product instructions and safety sheets

Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations.

Need help matching a document or checking your job? Contact our team. You can also find a store.

What tools do I need for the tiling stage?

A measuring cup, bucket, drill and paddle, notched trowel, spacers, spirit level, rubber mallet, cutting tools and a soft damp cloth, plus the selected tiles, adhesive and specified protective equipment.

Can I add 600 mL water to ready-to-use adhesive?

No. The 600 mL per 2 kg ratio belongs to the specified powder method and must match its pack. Ready-to-use adhesive is a separate product.

Do I have exactly 20 minutes to clean?

No. Clean as you work before adhesive hardens. The approximate setting reference is not a guaranteed cleaning window.

When can I grout?

Only after the adhesive has set as directed for the exact pack and conditions. Keep tiles undisturbed for at least 24 hours under the described method; allow longer where required.

How do you tile a bathroom yourself?

Tiling can be a costly exercise. With the Selleys White For Life range and a methodical approach it is a job you can do yourself, at a fraction of the cost, and get a result you will be proud of. The sequence is: mix the adhesive, spread about a square metre at a time with a notched trowel, bed each tile before the adhesive skins, level them, clean the excess off within 20 minutes, and keep off the floor for at least 24 hours.

What should I know about before you start?

Order extra. Add an extra 10% for waste and cuts, or 15% if you are laying diagonally. Diagonal layouts generate far more offcuts, and running out of tile mid-job with a discontinued batch is the worst outcome in the whole project. Dry lay first. Always dry lay your tiles without adhesive before tiling, to work out your placement.

What will I need?

For small tiling jobs and repairs, Selleys White For Life Ready To Use Tile Adhesive removes the mixing stage — it is a high grab wall and floor tile adhesive supplied ready mixed. Selleys White For Life Powder Tile Adhesive; A bucket and a paddle mixing bit; A notched trowel; A blade or knife; A silicone scraper or spatula; A soft clean cloth and a sponge.

What should I know about step 1?

Add water to the bucket, then slowly add the White For Life Powder Tile Adhesive powder while mixing with a paddle, ensuring there are no lumps. The ratio is 600 mL of water to a 2 kg powder bag . A paddle attached to a drill makes mixing easier and faster.

What should I know about step 2?

Spread the adhesive evenly onto the surface using a notched trowel, working on about one square metre at a time . One square metre is not arbitrary — it is roughly the area you can cover and tile before the adhesive begins to skin. Spread more than that and the far edge will have formed a surface skin by the time you reach it, and tiles bedded onto a skinned adhesive do not bond.

What should I know about step 3?

Place and fix each tile in position before the adhesive forms a surface skin . Adjust and bed the tile by sliding it roughly perpendicular to the notch pattern, to ensure full coverage on the back of the tile. That sliding action is the whole technique.

What should I know about step 4?

Check that the tiles are level and use a rubber mallet to tap and level them lightly if required. If the mortar rises up between the tiles as you place them, the bed is too thick and you need a smaller trowel. Adhesive squeezing into the joints is not a sign of good coverage — it is a sign the notch size is wrong for the tile, and it makes grouting far harder later because the joints have to be raked out.

What should I know about step 5?

Remove excess adhesive from the face of the tiles and from the joints with a damp cloth or sponge, before the adhesive sets (20 minutes) . Twenty minutes is the entire window. Adhesive left on a tile face past that has to be removed mechanically, and doing that on a glazed tile risks the glaze.