How To Build a Fire Pit

How do you build a backyard fire pit?

The source guide describes this fire-pit build, subject to confirming the adhesive and design for heat exposure: mark out a circle, dig and level the base, lay concrete blocks around the perimeter, bond each course to the one below with Selleys Liquid Nails Landscape, then drop a steel fire bowl or metal fire pit ring inside. No mortar, no bricklaying skills, and the only measuring tool you really need is a spirit level.

Do not treat the product-page temperature figure or the presence of a steel bowl as proof that an adhesive joint is suitable for a fire pit. Confirm the adhesive's suitability for the proposed design and heat exposure with us before building or lighting it. Keep adhesive away from flame and ignition sources.

Why Liquid Nails Landscape is the right adhesive here

Indicative data only, not intended for preparation of specifications.

Limitations — what to be careful about

How to build it

  1. Mark out the circle. Use spray paint on the lawn to mark where you want the pit to go.
  2. Dig out the lawn inside the circle to a depth of about 2 cm, removing all roots.
  3. Check the base is flat with a spirit level. Everything above this depends on it — a base out by a few millimetres becomes a visibly leaning wall three courses up.
  4. Lay the first course of concrete blocks along the perimeter of the fire pit.
  5. Build up the remaining courses to your desired height, using Liquid Nails Landscape to bond the layers together. Apply dobs or beads of adhesive thick enough to give good contact and spread between both surfaces, keeping the adhesive at least 12 mm in from the edges to minimise squeeze-out. Bring the block down onto the bead within 5 minutes and apply enough pressure to spread the adhesive between both faces. Check each course with the spirit level as you go.
  6. Place decorative rock at the base of the fire pit.
  7. Set the steel bowl or metal fire pit ring inside. Make sure it is level and will not tip over.
  8. Leave it to cure before use. The data sheet asks that bonded walls not be used for at least 24 hours.

Two application details worth getting right

Do not wipe the squeeze-out. The data sheet is explicit: wait until the product cures and remove it by trimming with a sharp blade, taking care not to cut into the bond. Wiping wet adhesive smears it across the block face where it is far harder to remove. Spilt or smeared adhesive is best left to cure and then removed by abrasion.

If you reposition a block, apply fresh adhesive. Lifting a block off a skinned bead and putting it back gives you no bond at all. That is a stated note on the data sheet, not a nicety.

Clean up and storage

Uncured adhesive can be removed with mineral turpentine. Cured product can be removed with the help of Selleys Sealant Remover or by mechanical action. Store the cartridge in a cool, dry, well-ventilated place out of direct sunlight and away from foodstuffs.

Liquid Nails Landscape's Australian SDS version 7.0, 16 November 2023, lists Danger: H227, H317 and H318 — combustibility, allergic skin reaction and serious eye damage. Follow the matching pack and SDS for protection, handling and first aid.

What you need

What the key numbers mean when you are laying blocks

A 10–15 minute skin time is short, and it dictates your rhythm. The data sheet asks you to bring the surfaces together within 5 minutes of applying the adhesive — before the product skins. So work one block at a time: apply, place, level, then move on. Do not run a bead along an entire course and then start setting blocks.

Elongation over 300% and a Shore A hardness of about 30 tell you this is a flexible bond rather than a rigid one. That is deliberate. A rigid mortar joint between concrete blocks cracks when the ground moves or the blocks expand differently in the sun; a flexible bond absorbs it. It also means the joint is shock proof, which matters on something people will knock with chairs and firewood.

A 2 mm per 24 hour cure rate is a depth figure. The data sheet asks you not to allow traffic on stairs or use walls for at least 24 hours after bonding, and the same logic applies here: build it, then leave it a day before you light anything.

Plan the complete project before starting How To Build a Fire Pit

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

  1. Inspect the substrate and correct moisture, movement, contamination or loose material first.
  2. Dry-fit parts and test appearance or compatibility in an inconspicuous area where appropriate.
  3. Confirm weather, temperature, ventilation and access for the full work and cure period.
  4. Keep within the stated working time, dimensions, coverage and waiting periods.
  5. Check the finished work before loading, wetting, painting or returning it to service.

Adapt the method without changing the product limits

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

Before you start: How To Build a Fire Pit

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.

  1. Read the complete method and limitations before opening the pack.
  2. Prepare surfaces, tools, supports and personal protective equipment.
  3. Confirm temperature, ventilation and weather conditions for application and cure.
  4. Keep within the stated dimensions, coverage, working time and waiting periods.
  5. Stop and obtain advice when the intended use is not expressly covered.

Range names and broad category labels are useful for finding options, but only the exact product instructions establish compatibility and use.

Details to check before you choose

More help for your project

Use these pages to compare the exact product, method or application that follows from How To Build a Fire Pit. A related page is a route into more specific information, not evidence that every product is interchangeable.

Product instructions and safety sheets

Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations.

Need help matching a document or checking your job? Contact our team. You can also find a store.

Does Landscape adhesive approve the fire-pit design?

No. Confirm the complete heat-exposed assembly before building or lighting; masonry adhesion alone is not fire-use approval.

How is Landscape applied to suitable blocks?

Use clean dry sound faces; apply dobs or a bead at least 12 mm from edges, join within five minutes and leave undisturbed at least 24 hours.

Can I wipe excess across the blocks?

No. Let squeezed-out adhesive cure and trim carefully as directed.

How do you build a backyard fire pit?

The source guide describes this fire-pit build, subject to confirming the adhesive and design for heat exposure: mark out a circle, dig and level the base, lay concrete blocks around the perimeter, bond each course to the one below with Selleys Liquid Nails Landscape , then drop a steel fire bowl or metal fire pit ring inside.

What are the limitations?

Service temperature -20°C to 100°C. Keep the fire inside the steel bowl or ring so the adhesive is never exposed to direct heat or flame. Do not build the design so that burning fuel sits against a glued joint; Not for soft or crumbly materials. Weathered, flaking blocks will not hold a bond regardless of the adhesive; Not for permanent water immersion; Cannot be painted over. If you plan to paint or render the blockwork, the adhesive joints will not take the coating.

How do I build it?

Do not wipe the squeeze-out. The data sheet is explicit: wait until the product cures and remove it by trimming with a sharp blade, taking care not to cut into the bond. Wiping wet adhesive smears it across the block face where it is far harder to remove.

How do I clean up and store it?

Uncured adhesive can be removed with mineral turpentine. Cured product can be removed with the help of Selleys Sealant Remover or by mechanical action. Store the cartridge in a cool, dry, well-ventilated place out of direct sunlight and away from foodstuffs. Liquid Nails Landscape's Australian SDS version 7.0, 16 November 2023 , lists Danger: H227, H317 and H318 — combustibility, allergic skin reaction and serious eye damage.

What will I need?

Selleys Liquid Nails Landscape and a caulking gun; A large steel fire pit bowl or fire pit ring; Decorative rock for the base; Spray paint to mark out.

What the key numbers mean when you are laying blocks?

A 10–15 minute skin time is short, and it dictates your rhythm. The data sheet asks you to bring the surfaces together within 5 minutes of applying the adhesive — before the product skins. So work one block at a time: apply, place, level, then move on.

How do I plan the complete project before starting How To Build a Fire Pit?

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

How can I adapt the method without exceeding the product's limits?

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

What should I know about before you start?

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.