How To Build a Skate Ramp

How do you build a DIY skate ramp for the backyard?

The build is simpler than it looks. You cut a curved profile from 30 mm ply to make one bearer, trace it to make two more, join the three bearers with noggins at each end, then sheet the curve with 8 mm ply. Everything is glued with Selleys Liquid Nails and screwed. It is a neat design that does not take up much room in a garage.

The one thing that decides whether the ramp rides well is how accurately the three bearers match each other. Cut one carefully, then trace it — do not draw three curves freehand and hope they line up, because any difference shows as a bump under the deck.

Why Liquid Nails Original suits this build

Liquid Nails Original is a high-strength multipurpose construction adhesive that forms a strong, lasting bond on most building substrates — timber, plasterboard, MDF, particleboard, masonry, concrete, tiles, ceramics, metals, plastics, rubber and glass. It comes in a 320 gram cartridge, a 100 gram tube or a 600 mL sausage, and it is beige. It meets Australian Standard AS-2329 (1999).

AppearanceThixotropic paste
TechnologySolvent evaporation
Open time20–30 minutes (weather dependent)
Cure time24 hours
RepositionableUp to 20 minutes after fitting
Gap bridgingUp to 9 mm
Sag resistanceNot more than 6 mm (AS2329)
Bond strength in tensile shear (wet and dry)Exceeds 1 MPa (AS2329)
Shelf life12–18 months

Indicative data only, not intended for preparation of specifications.

The 9 mm gap-bridging figure is the one that matters on a ramp. Ply edges are never perfectly true, and the joint between a noggin end and a bearer face is exactly the kind of ill-fitting joint this adhesive is designed for — the guide notes you should glue the tops of the bearers specifically to ensure the bond is gap free. A screw pulls two surfaces together at one point; the adhesive fills what is left along the rest of the joint.

An open time of 20–30 minutes gives you room to apply glue to several noggins before you start screwing, and you can reposition for up to 20 minutes after fitting. Cure is 24 hours, though a strong bond is usually achieved in 24 hours and the adhesive continues to strengthen over 2–3 days, curing fully in 7 days. Expect longer times for thicker applications, less porous surfaces and cold weather. Do not let anyone ride it the same day.

Limitations — what to know before you build

How to build it

  1. Determine the size. Work out how long and high you want the ramp, taking the ability of the riders into account.
  2. Draw the shape of your ramp onto the 30 mm ply. This first piece is your bearer — the structural rib that carries the curve.
  3. Cut your bearer with a jigsaw, or a circular saw if you have one. Wear safety glasses.
  4. Trace the remaining bearers. Use the first bearer as a template, tracing its shape onto the sheet and cutting as many as you need. For this size, two more is the recommendation. A wider ramp simply needs extra bearers.
  5. Cut out the hand grips. On the two outside bearers, cut a small section out with the jigsaw for a hand grip. Drill a small hole first so you have somewhere to start the blade.
  6. Cut the noggins. Using offcuts of ply, cut noggins the same height as your ramp with the circular saw. You need two at either end, so cut four.
  7. Fix it all together. Apply Liquid Nails Original to the ends of your noggins and place them against the inside of the bearer, then screw-fix in place. Pre-drill the bearers first to help guide the screw and avoid splitting the ply.
  8. Cut the top. Cut the 8 mm ply sheet to the length and width of the ramp with the circular saw.
  9. Mark up the screw lines. Mark screw lines on the ply so you know the screws will land on the bearers — measure up and mark a line with a straight edge.
  10. Join the top to the bearers. Apply Liquid Nails Original to the tops of the bearers so the bond is gap free. Lay the first sheet of ply on top and screw down, working from one end to the other so the ply follows the curve rather than bridging it.
  11. Sand and finish. Give it a light sand to remove any splintery ends, then paint.

Applying the adhesive properly

Make sure surfaces are free from oil, grease and dust, and wipe off any pooled water from wet timber. Cut the cartridge tip, fit the nozzle and cut it to a 5 mm opening. Apply a bead along the length of each bearer; on broad flat surfaces the data sheet asks for beads every 40 cm. Position the pieces and press firmly together, then fix with sufficient screws to hold the load and achieve contact over the total bond area.

Clean up

Uncured adhesive comes off with mineral turpentine. Cured product has to be scraped or sanded, so wipe squeeze-out from the ply face before you paint. Use the product in a well-ventilated area, avoid contact with skin and eyes, and do not swallow it.

Tools and materials

Plan the complete project before starting How To Build a Skate Ramp

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

  1. Inspect the substrate and correct moisture, movement, contamination or loose material first.
  2. Dry-fit parts and test appearance or compatibility in an inconspicuous area where appropriate.
  3. Confirm weather, temperature, ventilation and access for the full work and cure period.
  4. Keep within the stated working time, dimensions, coverage and waiting periods.
  5. Check the finished work before loading, wetting, painting or returning it to service.

Adapt the method without changing the product limits

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

Before you start: How To Build a Skate Ramp

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.

  1. Read the complete method and limitations before opening the pack.
  2. Prepare surfaces, tools, supports and personal protective equipment.
  3. Confirm temperature, ventilation and weather conditions for application and cure.
  4. Keep within the stated dimensions, coverage, working time and waiting periods.
  5. Stop and obtain advice when the intended use is not expressly covered.

Range names and broad category labels are useful for finding options, but only the exact product instructions establish compatibility and use.

Details to check before you choose

More help for your project

Use these pages to compare the exact product, method or application that follows from How To Build a Skate Ramp. A related page is a route into more specific information, not evidence that every product is interchangeable.

Product instructions and safety sheets

Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations.

Need help matching a document or checking your job? Contact our team. You can also find a store.

Are three bearers enough for every ramp?

No. The original count is an example; width, span and dynamic loads require an appropriate design.

Can the adhesive replace mechanical fixings?

No. Use the designed screws and supports; it must not be the sole structural bond.

When can the ramp be used?

Only after the design and assembly are checked and adhesive and finish have fully cured;24 hours support is not full cure.

How do you build a DIY skate ramp for the backyard?

The build is simpler than it looks. You cut a curved profile from 30 mm ply to make one bearer, trace it to make two more, join the three bearers with noggins at each end, then sheet the curve with 8 mm ply. Everything is glued with Selleys Liquid Nails and screwed.

Why Liquid Nails Original suits this build?

Liquid Nails Original is a high-strength multipurpose construction adhesive that forms a strong, lasting bond on most building substrates — timber, plasterboard, MDF, particleboard, masonry, concrete, tiles, ceramics, metals, plastics, rubber and glass. It comes in a 320 gram cartridge, a 100 gram tube or a 600 mL sausage, and it is beige.

What are the limitations?

Do not use the adhesive as the sole bonding agent for structural bonding. Every glued joint on this ramp is also screwed, and it needs to be; Avoid use in tightly clamped joints. Liquid Nails Original cures by solvent evaporation, and a joint clamped shut with no gap gives the solvent nowhere to go; Not for styrene foam. If you were tempted to pack a void with foam, use Liquid Nails Fast Grab instead; Not for mirrors, and not for metals heated by direct sunlight — bonds weaken at higher temperatures.

How do I build it?

Make sure surfaces are free from oil, grease and dust, and wipe off any pooled water from wet timber. Cut the cartridge tip, fit the nozzle and cut it to a 5 mm opening. Apply a bead along the length of each bearer; on broad flat surfaces the data sheet asks for beads every 40 cm.

How do I clean up afterwards?

Uncured adhesive comes off with mineral turpentine. Cured product has to be scraped or sanded, so wipe squeeze-out from the ply face before you paint. Use the product in a well-ventilated area, avoid contact with skin and eyes, and do not swallow it.

What should I know about tools and materials?

30 mm ply wood (for the bearers); 1 sheet of 8 mm ply wood (for the ramp surface); Selleys Liquid Nails Original; 60 mm and 25 mm galvanised screws; Jigsaw, and a circular saw if you have one; Tape measure and pencil; Paint and paint brush.

How do I plan the complete project before starting How To Build a Skate Ramp?

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

How can I adapt the method without exceeding the product's limits?

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

What should I know about before you start?

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.