How To Install Wall Panelling

How do you create a panelled feature wall?

Wall panelling lifts the look of a room without any structural work, and fixing it with an adhesive rather than nails or screws avoids filling and sanding dozens of fixing holes afterwards. The method is short: clean the wall and the back of the panel, cut the nozzle to about 5 mm, lay adhesive along the panel, press it into place, and adjust it while you still can. The product used here is Selleys Hold Up in the cartridge, which holds up to 360 kg/m² on vertical surfaces.

Two numbers shape how you work. Hold Up is adjustable for up to 15 minutes, so you have a genuine window to slide a panel into alignment — unlike a fast-grab construction adhesive. But it needs at least 48 hours to cure, and the data sheet is explicit that it must not be disturbed until cured. So the panel goes up quickly and then nothing happens for two days.

Limitations — where Hold Up should not be used

Hold Up works on most materials you would meet on a wall: timber, concrete, MDF, particleboard, plasterboard, metals, glass, masonry, tiles and ceramics, plus some plastics. A timber or MDF panel onto a plasterboard wall is squarely within that.

How to install the panelling

  1. Prepare the surfaces. Make sure they are clean, dry and free of dust. We also direct you to sand back any loose or peeling surfaces — adhesive bonded to flaking paint is only as strong as the flakes.
  2. Prepare the cartridge. Cut the cartridge tip, then cut the nozzle tip to the desired width, about 5 mm.
  3. Apply the adhesive. Use the caulking gun to apply a bead of Hold Up along the length of the panel in an 'S' shaped pattern. Our cartridge directions describe facing the V cut-out of the nozzle upwards and applying the adhesive in long vertical beads approximately 5 cm apart, covering the full surface — either way, the point is to cover the panel rather than run a single line down the middle.
  4. Position the panel. Bring the surfaces together and manoeuvre the wall panel into the desired position, pressing firmly so the adhesive spreads. The product is repositionable for up to 15 minutes.
  5. Clean up straight away. Clean up any excess with mineral turpentine before the product cures.
  6. Leave it for 48 hours. Allow 48 hours to cure before painting. The panel must not be disturbed during that time.

Clean up and storage

Clean up immediately with white spirits or turps before the product cures. Store the cartridge in a cool, dry place below 30°C. Shelf life is 12 months.

What the 15-minute adjustable window changes

Panelling is a job where alignment matters more than speed. Battens and boards have to line up with each other across a whole wall, and a millimetre out at the bottom of a two-metre panel is visible from across the room. An adhesive that grabs instantly forces you to place each panel perfectly the first time; Hold Up gives you a quarter of an hour to nudge it.

The trade-off is at the other end. Skin time is around 45 minutes and the product needs at least 48 hours to cure, during which it must not be disturbed. In practice that means bracing or taping panels that might slide, and not hanging anything on the wall, sanding it, or painting it for two days.

On the 360 kg/m² figure: that is the cartridge's vertical hold across a full square metre of bonded area, which is why covering the surface properly matters more than putting more adhesive in fewer places. We still recommend additional supports such as clamps during cure as a precaution for heavy objects, overhead applications and non-porous materials such as glass and metals.

What you need

Painting the finished wall

Hold Up is paintable after 48 hours with water-based paints. If you are filling the joints between panels, or the line where the panelling meets the skirting or cornice, use a flexible gap filler rather than a rigid one — Selleys No More Gaps Interior Multipurpose is the interior product for that, with a maximum recommended gap of 10 mm wide by 5 mm deep for good paint crack resistance.

Technical specification — Selleys Hold Up

TechnologySil-X
AppearanceSmooth white paste
AdjustableUp to 15 minutes
Skin timeApprox. 45 minutes
Cure timeAt least 48 hours
PaintableAfter 48 hours, with water-based paints
Vertical hold — cartridgeUp to 360 kg/m²
Vertical hold — tubeUp to 240 kg/m²
Packaging290 mL cartridge, 130 g tube
Shelf life12 months
ResistanceHeat, UV and water resistant (not for permanent water immersion)

Indicative data only, not intended for the preparation of specifications.

Plan the complete project before starting How To Install Wall Panelling

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

  1. Inspect the substrate and correct moisture, movement, contamination or loose material first.
  2. Dry-fit parts and test appearance or compatibility in an inconspicuous area where appropriate.
  3. Confirm weather, temperature, ventilation and access for the full work and cure period.
  4. Keep within the stated working time, dimensions, coverage and waiting periods.
  5. Check the finished work before loading, wetting, painting or returning it to service.

Adapt the method without changing the product limits

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

Before you start: How To Install Wall Panelling

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.

  1. Read the complete method and limitations before opening the pack.
  2. Prepare surfaces, tools, supports and personal protective equipment.
  3. Confirm temperature, ventilation and weather conditions for application and cure.
  4. Keep within the stated dimensions, coverage, working time and waiting periods.
  5. Stop and obtain advice when the intended use is not expressly covered.

Range names and broad category labels are useful for finding options, but only the exact product instructions establish compatibility and use.

Details to check before you choose

More help for your project

Use these pages to compare the exact product, method or application that follows from How To Install Wall Panelling. A related page is a route into more specific information, not evidence that every product is interchangeable.

Product instructions and safety sheets

Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations.

Need help matching a document or checking your job? Contact our team. You can also find a store.

Should I use an S bead or vertical strips?

The project and cartridge TDS differ. Confirm the matching cartridge and panel layout before applying; the TDS describes a V-cut nozzle and vertical beads about 5 cm apart.

How long can I adjust the panel?

Up to 15 minutes; after positioning, leave it supported and undisturbed until cured, at least 48 hours.

How do you create a panelled feature wall?

Wall panelling lifts the look of a room without any structural work, and fixing it with an adhesive rather than nails or screws avoids filling and sanding dozens of fixing holes afterwards. The method is short: clean the wall and the back of the panel, cut the nozzle to about 5 mm, lay adhesive along the panel, press it into place, and adjust it while you still can.

What are the limitations?

Hold Up works on most materials you would meet on a wall: timber, concrete, MDF, particleboard, plasterboard, metals, glass, masonry, tiles and ceramics, plus some plastics. A timber or MDF panel onto a plasterboard wall is squarely within that.

How do I install the panelling?

Prepare the surfaces. Make sure they are clean, dry and free of dust. We also direct you to sand back any loose or peeling surfaces — adhesive bonded to flaking paint is only as strong as the flakes; Prepare the cartridge. Cut the cartridge tip, then cut the nozzle tip to the desired width, about 5 mm.

How do I clean up and store it?

Clean up immediately with white spirits or turps before the product cures. Store the cartridge in a cool, dry place below 30°C. Shelf life is 12 months.

What the 15-minute adjustable window changes?

Panelling is a job where alignment matters more than speed. Battens and boards have to line up with each other across a whole wall, and a millimetre out at the bottom of a two-metre panel is visible from across the room. An adhesive that grabs instantly forces you to place each panel perfectly the first time; Hold Up gives you a quarter of an hour to nudge it.

What will I need?

Selleys Hold Up cartridge; A caulking gun — the data sheet notes that Hold Up is a high performance product and recommends a high quality gun for best results; Mineral turpentine or white spirits; A cloth to clean up.

What should I know about painting the finished wall?

Hold Up is paintable after 48 hours with water-based paints. If you are filling the joints between panels, or the line where the panelling meets the skirting or cornice, use a flexible gap filler rather than a rigid one — Selleys No More Gaps Interior Multipurpose is the interior product for that, with a maximum recommended gap of 10 mm wide by 5 mm deep for good paint crack resistance.

How do I plan the complete project before starting How To Install Wall Panelling?

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

How can I adapt the method without exceeding the product's limits?

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

What should I know about before you start?

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.