DIY Outdoor Bar, Drinks Trolley
How do you build an outdoor drinks trolley or bar cart?
This is a timber-framed cart on wheels, sized to hold an esky or a sink, glued and screwed together and finished with a clear exterior varnish. The build is: make two identical side frames, join them with rails top and bottom, screw timber slats across the base and either side of the sink, add wheels, plug the countersunk screw holes with dowel, then sand and coat. Every timber joint is glued with Selleys Aquadhere Exterior as well as screwed.
The dimensions used here are 900 mm high and 1600 mm long, but the design is not fixed — make it the size that suits your space, and set the internal width to match the sink or esky you intend to drop into it.
Why Aquadhere Exterior and not an interior wood glue
Aquadhere Exterior is an industrial-grade polyaliphatic cross-linking PVA developed for professional woodworkers. It produces bonds stronger than most woods and is weatherproof, which is the entire reason it belongs on a cart that will live outside. It is ideal for dowelling, joinery, laminating, veneering and cabinet and furniture making, and it will stick softwoods, hardwoods, particleboard, chipboard, plywood and MDF. It can be chiselled, routed or turned once cured.
| Technology | PVA |
| Colour | Off-white, dries clear with a yellow tinge |
| Coverage | Approximately 5 m²/L |
| Clamp time | Softwoods 30 minutes; hardwoods 1 hour |
| Maximum bond time | 24 hours |
| pH | 2–3 |
| Viscosity | 2000–3500 cP |
| Packaging | 250 mL, 500 mL, 1 L and 4 L bottles |
Indicative data only, not intended for preparation of specifications.
By contrast, Aquadhere Interior is interior-only, is not waterproof, and is not for structural use. It is the wrong glue for anything that goes outside, however good the varnish on top.
Limitations — what Aquadhere Exterior will not do
- Not recommended for joints subjected to constant high stress. On this cart the screws carry that; the glue adds strength and keeps the joints tight.
- Not suitable for below-waterline applications or continuous submersion. Weatherproof is not the same as immersed — keep the cart out of standing water.
- Avoid contaminating the adhesive with iron and steel — nails, for example. Aquadhere will stain a brown or black colour if contaminated with rust (iron oxide), or in the presence of the tannins found in many woods. That is worth remembering if you are building in a hardwood.
- Surfaces must be close fitting, dry and clean. Ensure the surface is dry before applying the product. PVA needs contact; it is not a gap filler.
- Longer clamping times may be required for joints under high stress.
What the figures mean for this build
Clamp for 30 minutes on softwood and an hour on hardwood, and do not stress the joint for 24 hours. On this cart the batten screws are doing the clamping, so the practical reading is: glue and screw a frame, then leave it before you start hanging weight off it. Maximum strength is attained in 24 hours, but longer in cold, damp conditions or with dense timbers.
Apply the adhesive liberally to one surface only. That is what the data sheet specifies. Gluing both faces of a joint wastes glue and gives you more squeeze-out to clean up, not a stronger bond.
Wipe excess off with a damp cloth while it is still wet. Cured PVA on a timber face will not take stain or varnish evenly, and it shows as a pale patch. Anything you miss can be sanded off once dry.
How to build it
- Measure and cut. Set out the overall size — 900 mm is a good height and 1600 mm a good length. Make one side frame first: cut two legs or posts 900 mm long, and two rails 1600 mm long, using a drop saw or circular saw.
- Fix the frame together. Use batten screws and Aquadhere Exterior for extra strength. Make the top rail flush with the top of the posts and set the bottom rail 150 mm up. Mark the screw positions — two at each join — countersink with the 16 mm spade bit, then pre-drill with the 4.5 mm bit. Apply the adhesive to the end grain of the rails and drive in the batten screws. Wipe any excess glue off with a wet cloth; anything you miss can be sanded once dry. Then make a second identical frame for the other side.
- Cut the connecting rails. Decide the internal width of the cart — matching it to your sink or esky is the sensible approach. Cut four rails to that width, apply Aquadhere Exterior to their ends, and connect the two frames together, fixing the top two rails flush with the top of the legs and repeating for the bottom two. The frame is now complete.
- Slat the base. Measure the overall width and cut timber slats for the base. Screw them down into the lower rails across the base of the trolley to give a solid platform for storage.
- Create bench space. Repeat the slatting either side of the sink or esky to make usable bench surfaces.
- Add the wheels. Screw the wheels and axle into position at one end of the cart.
- Plug the screw holes. Cut short pieces of 16 mm dowel to plug the countersunk batten screw holes, leaving them slightly proud. Apply Aquadhere Exterior to the inside of each countersunk hole and insert the dowel plug — you will see glue ooze out the sides, which is how you know the hole is full. Wipe the excess with a wet cloth. Once the glue is set, sand the dowel flush.
- Sand and finish. Sand the whole cart, removing splinters and pencil marks, dust it off, and apply a varnish or oil.
Clean up and handy tips
Uncured adhesive comes off with water. Cured adhesive has to be sanded or scraped. Shake the bottle before use. To fill small gaps, Aquadhere can be mixed with sawdust — useful for tidying a dowel plug that sits a little loose.
What you need
- Selleys Aquadhere Exterior
- Timber for legs, rails and slats
- Batten screws
- 16 mm timber dowel
- 16 mm spade bit and a 4.5 mm drill bit
- Drop saw or circular saw
- Drill
- Wheels and axle
- Sink or esky
- Sandpaper
- Cabots Clear Exterior Varnish, or your chosen oil
- Wet cloth for clean-up
Plan the complete project before starting DIY Outdoor Bar, Drinks Trolley
Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.
- Inspect the substrate and correct moisture, movement, contamination or loose material first.
- Dry-fit parts and test appearance or compatibility in an inconspicuous area where appropriate.
- Confirm weather, temperature, ventilation and access for the full work and cure period.
- Keep within the stated working time, dimensions, coverage and waiting periods.
- Check the finished work before loading, wetting, painting or returning it to service.
Adapt the method without changing the product limits
Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.
Before you start: DIY Outdoor Bar, Drinks Trolley
Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.
- Read the complete method and limitations before opening the pack.
- Prepare surfaces, tools, supports and personal protective equipment.
- Confirm temperature, ventilation and weather conditions for application and cure.
- Keep within the stated dimensions, coverage, working time and waiting periods.
- Stop and obtain advice when the intended use is not expressly covered.
Range names and broad category labels are useful for finding options, but only the exact product instructions establish compatibility and use.
Details to check before you choose
- 900 mm high and 1600 mm long is the size used here, but any size that suits your space works.
- Set the internal width to match your sink or esky.
- The screws hold the joint together; the glue spreads the load along the whole face and stops the frame racking.
- Aquadhere Exterior produces bonds stronger than most woods.
- Where you do clamp, allow 30 minutes for softwoods and 1 hour for hardwoods.
- Technology PVA Colour Off-white, dries clear with a yellow tinge Coverage Approximately 5 m²/L Clamp time Softwoods 30 minutes It is ideal for dowelling, joinery, laminating, veneering and cabinet and furniture making, and it will stick softwoods, hardwoods, particleboard, chipboard, plywood and MDF.
- Do not stress the joints for 24 hours.
- Maximum strength is attained in 24 hours, longer in cold, damp conditions or with dense timbers.
- Wipe it with a damp cloth while it is still wet.
- Anything you miss can be sanded once dry — and it must be, because cured glue on the surface will not take varnish or stain evenly.
- Aquadhere Interior is interior-only and not waterproof.
- For anything living outdoors, use Aquadhere Exterior.
More help for your project
Use these pages to compare the exact product, method or application that follows from DIY Outdoor Bar, Drinks Trolley. A related page is a route into more specific information, not evidence that every product is interchangeable.
- 4 Top Tips if a Storm Is Heading Your Way — In this guide, we show you how to plan the job, use our products as directed and get a reliable finish.
- Emergency Roofing Repairs — Leaking roofs and gutters need to be stopped quickly, because the damage water does to ceilings, insulation and wall cavities costs far more than the repair itself.
- How To Build a Deck — In this guide, we show you how to plan the job, use our products as directed and get a reliable finish.
- How To Build a Fire Pit — In this guide, we show you how to plan the job, use our products as directed and get a reliable finish.
- How To Build a Skate Ramp — In this guide, we show you how to plan the job, use our products as directed and get a reliable finish.
- How to get your BBQ in shape for Summer — After a winter under a cover, most barbecues come out with a layer of accumulated grease and grime.
- How To Install a Vertical Garden — In this guide, we show you how to plan the job, use our products as directed and get a reliable finish.
- How To Make Over Your Caravan — A caravan makeover breaks into eight stages: clean the exterior, make the van watertight, redo the interior, paint, refresh the awnings, relay the floor, and then the fun parts — accessories and linen.
Product instructions and safety sheets
Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations.
- Aquadhere Exterior — product details and pack options
- No More Gaps Exterior — product details and pack options
- No More Gaps Interior Multipurpose — product details and pack options
Need help matching a document or checking your job? Contact our team. You can also find a store.
What are the example dimensions?
About 900 mm high and 1600 mm long, with the bottom rail 150 mm up; adapt only with a suitable design and load/fixing checks.
How long before stressing Aquadhere Exterior joints?
At least 24 hours, longer in cold/damp conditions or dense timber; clamp softwoods at least 30 minutes and hardwoods at least one hour.
How do you build an outdoor drinks trolley or bar cart?
This is a timber-framed cart on wheels, sized to hold an esky or a sink, glued and screwed together and finished with a clear exterior varnish. The build is: make two identical side frames, join them with rails top and bottom, screw timber slats across the base and either side of the sink, add wheels, plug the countersunk screw holes with dowel, then sand and coat.
Why Aquadhere Exterior and not an interior wood glue?
Aquadhere Exterior is an industrial-grade polyaliphatic cross-linking PVA developed for professional woodworkers. It produces bonds stronger than most woods and is weatherproof, which is the entire reason it belongs on a cart that will live outside. It is ideal for dowelling, joinery, laminating, veneering and cabinet and furniture making, and it will stick softwoods, hardwoods, particleboard, chipboard, plywood and MDF.
What are the limitations?
Not recommended for joints subjected to constant high stress. On this cart the screws carry that; the glue adds strength and keeps the joints tight; Not suitable for below-waterline applications or continuous submersion. Weatherproof is not the same as immersed — keep the cart out of standing water; Avoid contaminating the adhesive with iron and steel — nails, for example. Aquadhere will stain a brown or black colour if contaminated with rust (iron oxide), or in the presence of the tannins found in many woods. That is worth remembering if you are building in a hardwood.
What the figures mean for this build?
Clamp for 30 minutes on softwood and an hour on hardwood, and do not stress the joint for 24 hours. On this cart the batten screws are doing the clamping, so the practical reading is: glue and screw a frame, then leave it before you start hanging weight off it.
How do I build it?
Measure and cut. Set out the overall size — 900 mm is a good height and 1600 mm a good length. Make one side frame first: cut two legs or posts 900 mm long, and two rails 1600 mm long, using a drop saw or circular saw.
How do I clean up and handy tips?
Uncured adhesive comes off with water. Cured adhesive has to be sanded or scraped. Shake the bottle before use. To fill small gaps, Aquadhere can be mixed with sawdust — useful for tidying a dowel plug that sits a little loose.
What will I need?
Selleys Aquadhere Exterior; Timber for legs, rails and slats; 16 mm timber dowel; 16 mm spade bit and a 4.5 mm drill bit; Drop saw or circular saw; Cabots Clear Exterior Varnish, or your chosen oil; Wet cloth for clean-up.
How do I plan the complete project before starting DIY Outdoor Bar, Drinks Trolley?
Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.
How can I adapt the method without exceeding the product's limits?
Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.
What should I know about before you start?
Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.