How To Update Skirting Boards

How do you update skirting boards?

Skirting boards are not just decoration — they protect the bottom of the wall from scuffs and knocks, which is exactly why they take so much punishment from furniture, pets and children. Replacing a tired run of skirting is a satisfying job with a visible result, and it comes down to two products: Selleys Liquid Nails Fast Grab to fix the boards to the wall, and Selleys No More Gaps Interior Multipurpose to close the line between the board and the wall afterwards.

Before you start, note the timing. Liquid Nails Fast Grab's technical data sheet says to bring the surfaces together as soon as possible — within the first 5 minutes of applying the adhesive, and to allow a minimum of 24 hours before removing any temporary fasteners. Plan on gluing one board at a time, with everything cut and dry-fitted first.

Why the wall-to-skirting joint needs a flexible filler

It is tempting to use the same wall filler you would use on a crack. Our rigid fillers all carry the same instruction — where movement occurs, use No More Gaps — and this joint moves. Two different materials meet there, fixed to a building that expands and contracts, so a rigid filler will split along the line within a season.

No More Gaps Interior Multipurpose has a movement capability of up to 15% and a skin time of 20 minutes at 23°C and 50% humidity. For optimum paint crack resistance, keep filled gaps to no more than 10 mm wide and 5 mm deep; the effects of shrinkage are more evident in larger gaps, which makes the paint over the bead more likely to crack. Allow the bead to skin before painting with water-based paints, longer for flat and ceiling paints, and 24 hours before oil-based paints. There is a dedicated guide to filling gaps between skirting boards and walls if you want the detail on tooling the bead.

Limitations — what to watch for

Liquid Nails Fast Grab

No More Gaps Interior Multipurpose

How to fit the new skirting boards

  1. Prepare the surfaces. Make sure they are clean, dry and free of oil, grease and dust. Best results come where one surface is porous, and a plasterboard wall against a timber board gives you two.
  2. Cut everything first. Have all the boards cut to size and dry-fitted before you open the cartridge, including the mitres at corners. The 5-minute working window does not leave room for adjustments.
  3. Prepare the cartridge. Cut the cartridge tip, then cut the nozzle to the desired width — about 5 mm.
  4. Apply the adhesive. Use the caulking gun to apply beads of Liquid Nails Fast Grab to the top and bottom of the back of the skirting board. Two beads along the length spread the load across the height of the board rather than concentrating it on one line.
  5. Position the board. Bring the surfaces together and manoeuvre the skirting into position. Do this within the first 5 minutes of applying the adhesive.
  6. Hold it while it sets. Tape the skirting board to hold it in place. If a board is slightly warped and does not sit flat along the wall, put bricks up against it to hold it in position while the adhesive cures.
  7. Wait 24 hours. Allow 24 hours for the adhesive to set before removing any temporary fasteners — in this case, the tape. Full cure is 72 hours.
  8. Fill the gaps. Fill the gap between the skirting board and the wall with Selleys No More Gaps Interior Multipurpose.

Clean up

Both products are water-based. Uncured Liquid Nails Fast Grab comes off with water; cured adhesive has to be scraped or sanded. Uncured No More Gaps wipes off with a damp cloth; once cured it has to be cut out, with residue softened using acetone.

What you need

Technical specification — Liquid Nails Fast Grab

TechnologyWater-based
Instant grabUp to 100 kg/m² (timber to timber)
Bond strength in tensile shear>1.5 MPa (AS 2329-1999E)
Strength after 7 daysUp to 500 tonnes/m² (timber to timber)
Bring surfaces togetherWithin the first 5 minutes
Before removing temporary fastenersMinimum 24 hours
Cure time72 hours
PaintableAfter 12 hours
Gap bridgingUp to 9 mm

Indicative data only, not intended for the preparation of specifications.

Plan the complete project before starting How To Update Skirting Boards

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

  1. Inspect the substrate and correct moisture, movement, contamination or loose material first.
  2. Dry-fit parts and test appearance or compatibility in an inconspicuous area where appropriate.
  3. Confirm weather, temperature, ventilation and access for the full work and cure period.
  4. Keep within the stated working time, dimensions, coverage and waiting periods.
  5. Check the finished work before loading, wetting, painting or returning it to service.

Adapt the method without changing the product limits

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

Before you start: How To Update Skirting Boards

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.

  1. Read the complete method and limitations before opening the pack.
  2. Prepare surfaces, tools, supports and personal protective equipment.
  3. Confirm temperature, ventilation and weather conditions for application and cure.
  4. Keep within the stated dimensions, coverage, working time and waiting periods.
  5. Stop and obtain advice when the intended use is not expressly covered.

Range names and broad category labels are useful for finding options, but only the exact product instructions establish compatibility and use.

Details to check before you choose

More help for your project

Use these pages to compare the exact product, method or application that follows from How To Update Skirting Boards. A related page is a route into more specific information, not evidence that every product is interchangeable.

Product instructions and safety sheets

Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations.

Need help matching a document or checking your job? Contact our team. You can also find a store.

Do I have 20 minutes to reposition the skirting?

Do not rely on that older project statement. The 2025 FastGrab sheet requires bringing surfaces together within five minutes.

Can I remove every support after 24 hours?

That is a minimum, with longer times for cold/humid conditions or less-porous surfaces; the sheet lists 72 hours cure.

How do you update skirting boards?

Skirting boards are not just decoration — they protect the bottom of the wall from scuffs and knocks, which is exactly why they take so much punishment from furniture, pets and children. Replacing a tired run of skirting is a satisfying job with a visible result, and it comes down to two products: Selleys Liquid Nails Fast Grab to fix the boards to the wall, and Selleys No More Gaps Interior Multipurpose to close the line between the board and the wall afterwards.

Why the wall-to-skirting joint needs a flexible filler?

It is tempting to use the same wall filler you would use on a crack. Our rigid fillers all carry the same instruction — where movement occurs, use No More Gaps — and this joint moves. Two different materials meet there, fixed to a building that expands and contracts, so a rigid filler will split along the line within a season.

What are the limitations?

Not for polyethylene, polypropylene or PTFE. Pre-test other plastics and rubbers; Not for mirrors — use Liquid Nails Mirror & Metal ; Not for metals heated by direct sunlight; bonds weaken at higher temperatures; Do not use as the sole bonding agent for structural bonding. Use mechanical fasteners in high-stress applications; Avoid tightly clamped joints such as cabinet making or joinery; Suitable for interior and sheltered exterior applications protected from moisture only; Expect longer cure times in cold or humid weather and on less porous surfaces; Interior use; not recommended for exterior use or areas exposed to constant water.

How do I fit the new skirting boards?

Prepare the surfaces. Make sure they are clean, dry and free of oil, grease and dust. Best results come where one surface is porous, and a plasterboard wall against a timber board gives you two; Cut everything first. Have all the boards cut to size and dry-fitted before you open the cartridge, including the mitres at corners. The 5-minute working window does not leave room for adjustments; Prepare the cartridge. Cut the cartridge tip, then cut the nozzle to the desired width — about 5 mm.

How do I clean up afterwards?

Both products are water-based. Uncured Liquid Nails Fast Grab comes off with water; cured adhesive has to be scraped or sanded. Uncured No More Gaps wipes off with a damp cloth; once cured it has to be cut out, with residue softened using acetone.

How do I plan the complete project before starting How To Update Skirting Boards?

Read the entire guide once before buying or opening materials. Turn the method into a sequence of preparation, application, waiting and finishing stages. List the exact products, tools, cleaning materials, masking, supports and protective equipment required for every stage.

How can I adapt the method without exceeding the product's limits?

Dimensions, materials and site conditions can vary, but product limitations still apply. Recalculate quantities and supports for the real job and use the current pack and technical documents for any product named in the guide. Stop when the guide does not cover a structural, electrical, plumbing, waterproofing or other regulated requirement.

What should I know about before you start?

Start with the exact task, materials, exposure and finish. Record what the product must do, where it will be used, what it must contact, and what can happen if it is unsuitable. Compare those facts with the current product page, pack label and technical documentation.

What details should I check before choosing?

The project requires a sharp knife and skirting boards that have already been cut to size; The Liquid Nails Fast Grab adhesive is repositionable for 20 minutes after fitting, during which time the skirting board should be taped to hold it in place; You should allow 24 hours for the adhesive to set before removing any temporary fasteners, such as the tape; The nozzle should be cut to the desired width, about 5mm, after cutting the cartridge tip; The total time for the project is listed as 1440 minutes, which equals 24 hours, reflecting the adhesive curing time before finishing touches like gap filling can be completed.

Which instructions and safety sheets cover this product?

Ready to choose a product? Use the links below for the products featured on this page. Check the exact product, pack and application before you start. Each product has its own directions and limitations. Need help matching a document or checking your job? Contact our team .