Product
Product Facts
- Product Name
- Point Works
- Brand
- Selleys
- Category
- Home & Garden > Adhesives & Sealants
Point Works
Selleys Point Works is a tile pointing compound applied with a trowel and used to fasten (point) hip and ridge roof tiles.
Check the pack details below, then find a retailer near you. Range and availability vary by store.

Product details
| Technology | Stryene - Acrylic |
|---|
Point Works: technical details
| Property | Typical Result | ||||
|---|---|---|---|---|---|
| Technology | Styrene-Acrylic | ||||
| Colour | Various | ||||
| Density | Approx. 1.40 | ||||
| Application Temperature | 10 – 40°C | ||||
| Cure Time | 24 hours | ||||
| Working Time | 10-20 minutes @ 40°C | ||||
| Shelf-life | 18 months | ||||
| Indicative data only, not intended for preparation of specifications | |||||
| Packaging | Size | ||||
|---|---|---|---|---|---|
| Pail made of recycled plastic | 10 L | ||||
What it does
- Forms an incredibly strong and durable bond between the tiles and the ridge.
- Passes fatigue loading cycles under cyclonic conditions (C3 and C4) as per Australian Standard AS4046.8-2015.
- Flexes with normal roof movement without cracking or breaking away
- Smooth formula makes it easy to mix and apply
- Colour matched to all commercially available roof tiles
- Sag resistant
- Water clean-up.
- Ideal for new roofs and roof repairs
Coverage
One 10 litre bucket of Selleys Point Works Gen III covers approximately 22 metres of ridging, provided the bedding has been finished vertically or slightly under ridge and free of holes and defects.
Tested performance and standards
Passes AS4046.8-2015 C3 & C4 cyclonic conditions.
Conditions and compatibility
- Selleys Point Works Gen III should not be used when the surface temperature during application or curing is 10°C or lower, particularly if humidity is greater than 80%.
- Do not use Selleys Point Works Gen III if rain is likely within 2 hours.
- The expected working time at 40°C is 10 to 20 minutes before product starts to skin.
Technical data sheet · 20/09/2024
Where to use it
Selleys Point Works Gen III is a flexible tile pointing compound used to bond the hip and ridge capping with the roof tiles. It is applied over the cement mortar to provide it a neat finish and to match the colour of the tiles.
Source: Technical data sheet, page 1.
Prepare the surface
Install hip/ridge tiles in accordance with AS 2050:2018 using a bedding mix of 4 to 1 ratio (sand to cement). Ensure that bedding is free of all holes and defects and has been finished at least 3mm under the hip and ridge tiles (e.g. rake wet bedding immediately under the hip/ridges with the head of a screw). Ensure the surfaces are clean and free of loose material.
Ensure the edges of hip/ridge tiles and the roof tiles next to the bedding are free of powdery bedding mortar. Before applying the Selleys Point Works Gen III, make sure the bedding has cured for at least 12 hours (15°C or higher) or at least 24 hours for 10-15°C.
Source: Technical data sheet, page 1.
How to apply
The following should only be used as a guide and the installer should apply all Australian Standards, BCA/NZBC requirements, and best practices when pointing roofs with Point Works Gen III. Trowel Selleys Point Works Gen III to a thickness of 3 to 5 mm, ensuring that pointing has full contact with the roof tiles and under the edge of the hip/ridge tiles. Trowel in small runs to ensure a neat and clean finish.
Sweep down each hip and ridge as pointing is complete to prevent excess product adhering to tiles. Use a wet trowel to get a smooth finish. Regularly clean the trowel with water. Do not brush or sponge Selleys Point Works Gen III as this will damage the finished appearance. In case of cold and damp conditions, use Pointworks Accelerant spray to speed up the drying.
Install weepholes in the pointing and the bedding mortar. Weepholes may be put in as you go or on completion of the job. Regularly mix the product in the bucket to avoid skinning. If the product is left open for any period and a crust has formed, discard the dried crust material. The material below will be satisfactory. Keep unused Selleys Point Works Gen III closely covered with the plastic sheet inside the bucket and replace lid firmly.
On re- opening, remove plastic sheet and any skin formed around the edges, mix and use as normal. Before use, Selleys Point Works Gen III may be stirred to attain the desired trowelling consistency. Never add water to restore trowelling ability. If mixing colour into Selleys Point Works Gen III, place the colour as deep as possible into the centre of the bucket. Mix with a power-driven mixing wand at low speed until the colour becomes consistent throughout.
Source: Technical data sheet, page 1.
Where not to use it
- Selleys Point Works Gen III should not be used when the surface temperature during application or curing is 10°C or lower, particularly if humidity is greater than 80%.
- Do not use Selleys Point Works Gen III if rain is likely within 2 hours.
- The expected working time at 40°C is 10 to 20 minutes before product starts to skin.
Source: Technical data sheet, page 2.
Application tips
Although 2 hours of curing in good weather is sufficient for the product to withstand light rain, curing times are extended in cold and wet conditions. Curing times can be reduced by the application of Point Works Accelerant Spray within 30 minutes after pointing has been applied.
Source: Technical data sheet, page 2.
Clean up
Spills and tools can be cleaned up with water before it has dried. Stubborn material can be removed with Mineral Turps.
Source: Technical data sheet, page 2.
Storage
Store unopened pails below 30°C in a cool dry place away from direct sunlight. Unopened pails can be stored for 18 months from the date of manufacture. Opened pails may skin at the surface. Discard any lumps or skin and remaining product can be used.
Source: Technical data sheet, page 2.
Safety before you start
Check the product name on your pack against the Australian SDS below before use.
SELLEYS POINT WORKS
SDS signal word: Warning.
- May cause an allergic skin reaction. (H317)
Handling: Avoid eye contact and skin contact. Avoid inhalation of dust.
Protective equipment and ventilation
Wear safety shoes, overalls, gloves, safety glasses. Available information suggests that gloves made from nitrile rubber should be suitable for intermittent contact. However, due to variations in glove construction and local conditions, the user should make a final assessment. Always wash hands before smoking, eating, drinking or using the toilet. Wash contaminated clothing and other protective equipment before storing or re-using.
Ventilation: Ensure ventilation is adequate to maintain air concentrations below Exposure Standards. Use only in well ventilated areas. Avoid generating and inhaling dusts. Use with local exhaust ventilation or while wearing dust mask. Vapour heavier than air - prevent concentration in hollows or sumps. Do NOT enter confined spaces where vapour may have collected.
Australian safety data sheet · issued 25 March 2024 · sections 2, 7 and 8. Read the full SDS for first aid, spill response, incompatibilities and disposal.
SELLEYS POINT WORKS: storage and product data
| Pack named in this SDS | Product code | Barcode |
|---|---|---|
| Pointworks Burgundy 10L | 103383 | 9300697119353 |
| Pointworks Burnt Orange/Earth 10L | 103384 | 9300697117946 |
| Pointworks Charcoal/Soho Night 10L | 103385 | 9300697124395 |
| Pointworks Cloud 10L | 103788 | 9300697133526 |
| Pointworks Crimson/Aurora 10L | 103386 | 9300697118004 |
| Pointworks Dark Grey/Barramundi 10L | 103387 | 9300697117939 |
| Pointworks Desert Red 10L | 103388 | 9300697119360 |
| Pointworks Grey/Saber 10L | 103389 | 9300697117960 |
| Pointworks Jet Black/Sambuca 10L | 103390 | 9300697118011 |
| Pointworks Kava/Silver Perch 10L | 103367 | 9300697120267 |
| Pointworks Mahogany/Bungalow 10L | 103368 | 9300697119834 |
| Pointworks Mid Grey/Babylon 10L | 103369 | 9300697119032 |
| Pointworks Midnight Blue/Camelot 10L | 103373 | 9300697124791 |
| Pointworks Neutral 10L | 103374 | 9300697117984 |
| Pointworks Olive/Caraway 10L | 103375 | 9300697124678 |
| Pointworks Outback Red/Saffron 10L | 103376 | 9300697119018 |
| Pointworks Rainforrest/Wollemi 10L | 103377 | 9300697119629 |
| Pointworks Ruby Red/Chilli 10L | 103378 | 9300697124715 |
| Pointworks Terracotta/Cottage Red 10L | 103380 | 9300697117892 |
| Pointworks Walnut/Aniseed 10L | 103381 | 9300697119049 |
| Pointworks Wild Rice 10L | 103382 | 9300697117908 |
| Point Works Salt Spray | 103379 | 9300697133007 |
Store between jobs
Store in a cool, dry, well-ventilated place and out of direct sunlight. Store away from foodstuffs. Store away from incompatible materials described in Section 10. Store away from sources of heat and/or ignition. Keep container standing upright. Keep containers closed when not in use - check regularly for spills.
| Form | Paste |
|---|---|
| Colour | Various |
| Odour | Mild, characteristic |
| Solubility | Dispersible in water |
| Specific Gravity | 1.35 - 1.42 |
| Relative Vapour Density (air=1) | >1 |
| Vapour Pressure | N Av |
| Flash Point (°C) | N App |
| Explosion/Flammability Limits | N App |
| Autoignition Temperature (°C) | N Av |
| Melting Point/Range (°C) | N Av |
| Boiling Point/Range (°C) | N Av |
| pH | N Av |
| Viscosity | N Av |
| Total VOC (g/Litre) | N Av |
Others in this range
Alongside this product:
- Hold Up
- Liquid Nails Clear
- Liquid Nails Construction Adhesive
- Liquid Nails Exterior
- Liquid Nails Extreme Grab
- Liquid Nails Fast Grab
- Liquid Nails Flex
- Liquid Nails Heavy Duty
- Liquid Nails Landscape
- Liquid Nails Mirror & Metal
- Liquid Nails Rapid Cure
- Point Works Accelerant Spray
- Pro Trade Construction Adhesive Fast Grip
- Pro Trade Construction Adhesive Multipurpose
Browse from here
Where this page sits:
Typical values describe the material in this safety data sheet. They are not application instructions or performance guarantees. N Av means not available; N App means not applicable.
Ingredients disclosed in the SDS
CHEMICAL ENTITY CAS NO PROPORTION Crystalline silica (contains <0.1% respirable) 14808-60-7 >60 % (w/w) 1,2-Benzisothiazol-3(2H)-one (BIT) 2634-33-5 <0.05 % (w/w) 5-Chloro-2-methyl-4-isothiazolin-3-one (CMIT) 26172-55-4 <0.05 % (w/w) 2-Methyl-2H-isothiazol-3-one (MIT) 2682-20-4 <0.05 % (w/w) Ingredients determined to be non-hazardous or below reporting limits Balance ____________ 100%
These are the ingredients disclosed for hazard communication, not the complete formulation. Use the application instructions to decide suitability for your project.
First aid from the matching SDS
If poisoning occurs, contact a doctor or Poisons Information Centre (Phone Australia 131 126, New Zealand 0800 764 766).
Inhalation: Remove victim from exposure - avoid becoming a casualty. Remove contaminated clothing and loosen remaining clothing. Allow patient to assume most comfortable position and keep warm. Keep at rest until fully recovered. Seek medical advice if effects persist.
Skin Contact: Effects may be delayed. If skin or hair contact occurs, remove contaminated clothing and flush skin and hair with running water. If swelling, redness, blistering or irritation occurs seek medical assistance.
Eye contact: If in eyes wash out immediately with water. In all cases of eye contamination it is a sensible precaution to seek medical advice.
Ingestion: Rinse mouth with water. If swallowed, do NOT induce vomiting. Give a glass of water to drink. Never give anything by the mouth to an unconscious patient. If vomiting occurs give further water. Seek medical advice.
PPE for First Aiders: Wear safety shoes, overalls, gloves, safety glasses. Available information suggests that gloves made from nitrile rubber should be suitable for intermittent contact. However, due to variations in glove construction and local conditions, the user should make a final assessment. Always wash hands before smoking, eating, drinking or using the toilet. Wash contaminated clothing and other protective equipment before storing or re-using.
Notes to physician: Treat symptomatically. Effects may be delayed.
Disposal
Persons conducting disposal, recycling or reclamation activities should ensure that appropriate personal protection equipment is used, see "Section 8. Exposure Controls and Personal Protection" of this SDS. If possible material and its container should be recycled. If material or container cannot be recycled, dispose in accordance with local, regional, national and international Regulations.
Australian SDS · sections 1, 3, 4, 7, 9 and 13 · 25 March 2024
Technical and safety documents
The technical data sheet covers application and performance conditions. The safety data sheet covers hazards and safe handling. Use both alongside the pack instructions.
- Technical data sheet — Point Works · 20/09/2024
- Australian SDS — SELLEYS POINT WORKS · 25 March 2024
Need a hand choosing the right document or checking your application? Contact our team with the product name, pack code, surfaces and intended use.
What is Point Works Gen III used for?
It is a flexible styrene-acrylic roof-pointing compound applied over prepared cement bedding to bond hip and ridge capping to roof tiles. The technical sheet describes it as an adhesive mechanical fastener under AS 2050:2018; the installer must still meet the applicable roof requirements.
Can I apply it at 10°C?
No. The technical sheet prohibits use when the surface temperature during application or curing is 10°C or lower, particularly above 80% humidity. That restriction controls the lower edge of its 10°C to 40°C table.
How much dry weather do I need?
Confirm the rain window for your exact pail before scheduling. Our online directions prohibit application if rain is expected within 12 hours, while the Gen III sheet gives two hours and only conditional light-rain resistance after two hours in good weather. Cold or wet conditions extend cure; accelerant does not remove the weather limits.
How should the bedding be prepared?
Before using these instructions, ask our team to confirm the 20 September 2024 Gen III technical sheet applies to your exact pail. Use four parts sand to one part cement, free of holes and defects, finished at least 3 mm under the hip/ridge tiles. Remove loose and powdery material. Cure bedding at least 12 hours at 15°C or higher, or at least 24 hours in the 10°C to 15°C band; Point Works itself must not be applied or cured at 10°C or lower.
How thick should I trowel it?
Before using these instructions, ask our team to confirm the 20 September 2024 Gen III technical sheet applies to your exact pail. Apply 3–5 mm thick with full contact to the roof tiles and beneath hip/ridge tile edges, working in short runs. Install weepholes in both pointing and bedding mortar.
Can I brush or sponge the finish?
No. Use a wet trowel and clean it regularly with water. Brushing or sponging damages the finished appearance. Sweep each completed hip/ridge to prevent excess sticking to tiles.
Can I add water if it thickens?
Never add water to restore trowelling ability. Stir regularly; discard a dried crust, skin or lumps and use the material beneath. Close-cover with the inner plastic sheet and refit the lid.
How long do I have to work with it?
Before using these instructions, ask our team to confirm the 20 September 2024 Gen III technical sheet applies to your exact pail. The technical sheet gives 10–20 minutes at 40°C before skinning. This is not a universal timing for all conditions. It lists a 24-hour cure, with longer drying in cold or wet conditions.
When should I apply Accelerant Spray?
Before using these instructions, ask our team to confirm the 20 September 2024 Gen III technical sheet applies to your exact pail. The technical sheet recommends Point Works Accelerant Spray in cold/damp conditions, within 30 minutes after applying the pointing. Follow the spray directions and retain the compound’s temperature and rain restrictions.
How far does a pail go?
Before using these instructions, ask our team to confirm the 20 September 2024 Gen III technical sheet applies to your exact pail. Approximately 22 metres of ridging per 10 L pail, provided the bedding is finished vertically or slightly under the ridge and is free of holes and defects.
How do I clean and store it?
Before using these instructions, ask our team to confirm the 20 September 2024 Gen III technical sheet applies to your exact pail. The Gen III sheet says water before drying and mineral turps for stubborn material. Store unopened pails below 30°C, cool, dry and out of direct sunlight, for up to 18 months from manufacture. Close-cover opened product with the inner plastic sheet and lid; discard skin or lumps.
Can I use the online movement, paint or service-temperature claims for a specification?
Ask our team to confirm your exact pail and application first. The online ±25% movement, paintability after cure, −20°C to 80°C service range and broad-substrate claims are not established by the linked Gen III technical sheet.